References

 

Index

 

Bahrain International Airport (Ongoing)

Support the ORAT program for the airport modernization plan (AMP) 

Airport data

  • 2 Runways
  • 2 Passenger terminals
  • 54 Destinations
  • 24 airlines

Mission

  • Support the ORAT program of Fraport of BAC (airport operator)

Project details

  • Airport Operational Assessment
  • Support Elaboration of operational concept, SOP`s, KPI, SLA
  • ORAT program including training, trial and transfer

Bahrain International Airport

Bild1

Traffic

PAX (mil)
13,5
ATM (000)
106 350

Project data

Term

2017 to 2019

 

 

Kuwait Internationl Airport Terminal 5 – Jazeera Airways

ORAT support for Boodai Corp. Kuwait

Airport data (KWI-Total)

  • 2 Runways
  • 4 Passenger Terminals – Terminal 2 to be built
  • 19 Destinations – Jazeera only
  • T5: Jazeera Airways & Partner Airlines

Mission

  • Support the ORAT program foe the new terminal 5 operator

Project details:

  • Airport Operational Assessment
  • Elaboration of Terminal Operations Manual
  • Conducting and coordinating all Trainig Moduls
  • Conducting Trial Operations
  • After opening support

T5 Kuwait International Airport

T5 Kuwait International Airport

Traffic

PAX (mil)
3,6
ATM (000)
4 750

Project data

Term

2018

 

 

Florianópolis International Airport, Brazil

OPEX and airport organization review & revision

Airport data

  • 2 Runways
  • 1 Passenger terminal
  • 44 Destinations
  • 21 airlines

Mission

  • Review the OPEX and airport organization data for OHL Concessões Brasil for the proposed participation of OHL at the 4th round of airport concession 2017 in Brazil

Project details:

  • OPEX review provided by the client -such as staff cost, facility management, utilities, rent, IT & telephon cost, insurance
  • Review airport organization and elaboration of revised airport organization

Hercílio Luz International Airport

Hercílio Luz International Airport

Traffic

PAX (m)
3,6
ATM (000)
52 500

Project data

Term

2017

 

 

Moscow Sheremetyevo International Airport

Optimizing Aeroflot ground handling department

Airport data

  • 125 destinations incl. 73 international
  • Biggest Russian Airline
  • 4 Star airline

Mission

  • Ground handling optimization in support for AT Kearney, Moscow

Project details/Optimization regarding:

  • Passenger handling (check-in, boarding, lounges, PRM)
  • Review airport organization and elaboration of revised airport organization
  • Baggage handling (loading, ULD, transfer baggage, lost & found, mishandled baggage delivery)
  • Ground handling (ramp processes, load control, weight & balance, de-icing)
  • Ground service equipment (drivers, maintenance, resource coordination and dispatch)
  • ULD stock management

Aeroflot aircrafts at Sheremetyevo Airport

Aeroflot aircrafts at Sheremetyevo Airport

Traffic

Aeroflot at SVO PAX (m)
25
Aeroflot fleet (n° of aircrafts)
172

Project data

Term

2015

 

 

Stockholm Bromma International Airport

Airport expansion project

Airport data

  • 1 runway
  • 1 terminal
  • 17 destinations incl. 4 international
  • 4 airlines

Mission

  • Development and support in airport expansion project for Swedavia

Project details/Optimization regarding:

  • Supporting the development of a transition plan for ongoing airport operations during the expansion phase
  • For airside and terminal operations
  • Review and verification of operational procedures
  • Support in establishing fallback procedures for transition time

Bromma Airport,Stockholm, Sweden

Bromma Airport,Stockholm, Sweden

Traffic

PAX (m)
2,5
ATM (0000)
57 000

Project data

Term

2015

 

 

Sao Paulo International Airport (Guarulhos)

Strategic ORAT Advisor and Operational Trials GRU Passenger Terminal 3

Airport data

  • 2 runways
  • 3 terminal
  • 86 destinations worldwide
  • 39 airlines
  • Avianca Brazil, TAM Airlines, Gol and Azul hub

Mission

  • Strategic ORAT advisor to GRU Executives later responsible for Terminal 3 trial operation planning and execution. For this Fraport AG was subcontracted by ON-BLOCK

Project details:

  • Evaluate ORAT meeting and reporting structure
  • Review concepts and SOP’s
  • Monitor staffing & training plans
  • Evaluate trial concept, trial planning and setup
  • Evaluate trial operations execution Identify the overall OR status & advise on terminal opening and opening configuration and transfer strategy

Sao Paulo International Airport Terminal 3

Sao Paulo International Airport Terminal 3

Traffic

PAX (m)
39
ATM (0000)
304’600
Cargo (‘000 cbm tons)
329’828

Project data

Term

2013 – 2014

 

 

St. Petersburg International Airport Pulkovo

ORAT main terminal building

Airport data

  • 2 runways
  • 3 terminal
  • 118 destinations worldwide
  • 58 airlines
  • Rossiya Russian airlines hub

Mission

  • ORAT support main terminal building on behalf of Fraport AG

Project details:

  • Strategic ORAT advisor
  • Recommendations on the operational concept
  • Supervising operational trials

Pulkovo Airport

Pulkovo Airport

Traffic

PAX (m)
13,5
ATM (0000)
137’529296’300
Cargo (‘000 cbm tons)
329’828

Project data

Term

2013 – 2014

on-block:

ORAT support

ORAT services

Airport trial operations

Airport relocation

Airport operational support

 

Contact us:

+43 (0)676  5576278
office@on-block.at